Kitchen cabinetry prepared from a measured layout. Include appliance specifications, service positions, cabinet internals, worktop interfaces and the selected door and hardware finishes.
Kitchen cabinet run specified from the floor plan and appliance schedule. Cabinet construction, fronts, hardware and service openings should be coordinated before production.